Overview

First fix is the structural carpentry stage, the stud walls, floor joists, roof timbers and door linings that go in before plastering starts.

Get this stage right and everything that follows, from a plumb wall to a door that hangs properly, is straightforward. Get it wrong and every later trade ends up fighting the same problem.

What's included

  • Stud partition walls

    Non-structural and load-bearing partitions, built plumb and true.

  • Floor joists & decking

    Timber floor structures ready for insulation and floorboards.

  • Door linings & studwork

    Openings framed to the right size before the door goes in.

  • Roof timbers

    Structural timberwork for extensions, dormers and loft conversions.